The works include refurbishment of Heating Ventilation and Air Conditioning (HVAC) equipment on various levels from three to eight in Block C of the hospital. VAE are excited to be back on site at Lismore Base Hospital after completing the Stage 3B2 mechanical services works in 2019.
Lismore Base Hospital Stage 3C - HVAC Refurb
Hansen Yuncken awarded VAE Group the mechanical services on Lismore Base Hospital Stage 3C.
![](/generated/1280w-3-2/lbh-1-jpg.jpg?1669262336)
![](/generated/1280w-3-2/lbh-3-jpg.jpg?1669262336)
![](/generated/1280w-3-2/l12-chiller-jpg.jpg?1669262411)
![](/generated/1280w-3-2/l7-vsds-and-mssbs-jpg.jpg?1669262411)
![](/generated/1280w-3-2/l7-plant-hash2-jpg.jpg?1670890138)